Garden Maintenance

Planting Soiled Sapling A hole is dug with a width and depth of 20-30 cm left on all sides of the soil layer surrounding the root of the sapling (sides and bottom). Top soil (20-30 cm top) is put on one side and subsoil on one side. After the pit is opened, the bottom of the pit is processed with a shovel or waist. When the sapling is placed in the pit, the hole is filled with top soil, so that the root collar of the sapling is at the ground level. If there is a root that has come out of the tube, bag or container, the parts that come out are cut and removed. The sapling is removed from the container without spreading the soil, and the bottom is cut with 2 finger-thick soil. Thus, root curl is eliminated. The sapling is placed perpendicular to the center of the pit without spreading the soil. Top soil is filled into the pit first. This filling process is done little by little and tightly compressed with the foot. After this process, which has been done a few times, the pit is completel...

Control Procedure Of The Imperative Product

OBJECTIVE: Pakel Architecture, Design and Implementation is to create a system in order to prevent and review raw materials, semi-finished products and products and customer returns, accidental use and shipment at any process stage, that do not comply with the specified quality requirements, and to ensure that they are kept under control. SCOPE: Pakel Architecture, Design and Application covers the inconveniences in all raw materials, semi-finished products and products that are purchased from suppliers, produced in our factories and that have a negative effect on product quality. DEFINITIONS: Corrective Action: Activities carried out to eliminate emerged nonconformities and prevent their recurrence. Preventive Action: It is the work on detecting potential errors that may occur and taking necessary measures to prevent them from occurring. Management Representative: Person who manages quality systems by improving the concept and awareness of quality within the organization, co...

Waste Control Procedure

OBJECTIVE: It is the definition of the activities to be carried out in order to protect the aforementioned factors from the possible threats of the wastes that occur during the activities carried out in Pakel Architecture, Design and Project Implementation and are in the form of solid, liquid and gas / vapor to the natural environment, neighbors and the living environment. It is aimed to control the wastes according to these definitions and methods. SCOPE: It covers all activities carried out in Pakel Architecture, Design and Project Implementation. All employees are responsible. DEFINITIONS: Foundation: It will be used instead of Pakel Architecture, Design and Project Implementation. Field: It will be used instead of manufacturing and assembly areas. Machine: It will be used instead of the machine and its connected equipment to be used in the disposal of waste. Equipment: It will be used instead of vehicles, tools and equipment to be used in waste disposal activities. Field Water:...

Electrical Installation

As Pakel Architecture, Design and Project Implementation, we act in the awareness that the delivery of electricity, which is a part of modern life, meticulously and in accordance with all required standards, is extremely important in terms of both life and property safety. The process of laying the pipes before plaster in the place where the installation will be laid is called “flush-mounted installation”, while the process of laying electrical transmission installation after rough construction is called “surface-mounted installation”. Thanks to this process, which is still in the construction phase, no pipes can be seen on the wall surface, so all connections remain inside the wall. How to lay electrical wiring 1. Placement of pipes Before the buildings are built, electrical installation projects are prepared. In these projects, all the details such as the sections of the pipes, where they will be placed, where the switches and sockets will be are specified. The expert staff of the...